Insights
by ecoro
Insights on automation beyond the building, Logistics 4.0, and the future of automated material flow.
Subscribe to ecoro Inside — ecoro’s monthly newsletter containing insights into the future of automated and sustainable freight transport.

Why the Automation Gap Is the Last Problem Industrial Sites Fix
Walk through a modern food manufacturing or pharmaceutical campus and the contrast is immediate. Inside each building, the operation is tight. Lines run to takt.
Featured Articles

The Automation Gap in Industrial Logistics: What It Is, Why It Persists, and What Closing It Delivers
The industrial automation industry has made substantial progress over the past two decades. Inside manufacturing facilities and warehouses, automation penetration is high, the technology is

What Is Cross-Building Automation?
Most industrial sites today have the same structural gap. Inside each building, automation is mature and performing well — palletizers, AS/RS, AMRs, conveyors. Between buildings,

What Outdoor Pallet Transport Really Costs: The Full Picture Most Sites Are Missing
The number on the budget line is wrong. Not because the inputs are inaccurate. Because most operations teams calculate the cost of outdoor pallet transport

Why Your Automated Lines Are Underperforming
The problem is outside your building. When a palletizer drops below its rated output, the investigation starts at the palletizer. When an AS/RS runs below

The Safe Alternative to Forklifts Between Buildings: What It Is and What the Transition Looks Like
Forklifts were not designed for the job they are doing on most industrial campuses. They were engineered for short-range, high-variability indoor handling — picking, stacking,

How to Evaluate an Automated Pallet Transport System for Your Site: A COO’s Checklist
Not every automated pallet transport system is built for the same problem. Some are designed for indoor environments and have been adapted — imperfectly —
Recommended Reading Path
If you're a Plant Manager:
Article 4 → Article 3 → Calculator → Contact
If you're a Plant Manager:
Article 4 → Article 3 → Calculator → Contact
If you're a Plant Manager:
Article 4 → Article 3 → Calculator → Contact





