🔊 UPDATE:

ecoro selected as 1 of 10 startups in EIT Urban Mobility Scale-up 2025.

Industrial freight fully automated

The outdoor logistics problem

The gap between your buildings is the gap in your automation.

Indoor AGVs stop at the warehouse door.

 Long-haul trucks start at the public road. What happens in between – loading, yard transport, unloading – still runs on manual labor and manual coordination. ecoro is the first system built specifically for this segment.

66-80%

OPEX reduction

Total outdoor pallet transport operating cost reduction versus the forklift baseline.

0,35 - 0,51€

Cost per pallet at scale

Until ecoro, no system was ever designed specifically for automated cross-building pallet transport on private industrial premises.

The ecosystem

Hardware. Software. Infrastructure. One System

What ecoro is

Not a workaround. Not a modified AGV.

A system built from the ground up for this.

ecoro is an integrated system — autonomous terminals, a dedicated closed lane, electric shuttles, and fleet control software, all working as one. It operates on private premises only, which eliminates open-road regulation and allows deployment in months, not years.

It does not replace your indoor automation. It completes it — connecting every building on your site into one continuous, predictable material flow.

SYSTEM INTEGRATION
 

Automated terminals

Autonomous loading and unloading at each building, connected to your WMS/ERP. No staging, no manual handling.

CONTINUOUS OPERATION
 

Dedicated closed lane

A defined route on your own premises. No mixed traffic, no open-road regulation — deployable in months, able to run 24/7.

HIGH THROUGHPUT
 

Electric shuttles

Purpose-built for this one job — not a modified indoor AGV. Each carries up to 2.4 tonnes, with the intelligence in the infrastructure, not the vehicle.

ONE MATERIAL FLOW
 

Fleet control software

Centralised scheduling from one dashboard — connecting every building on your site into one continuous flow.

"The only system that closes the automation gap between buildings — and is deployable today."
"The only system that closes the automation gap between buildings — and is deployable today."
High throughput
 

Electric shuttles

Purpose-built for this one job — not a modified indoor AGV. Each carries up to 2.4 tonnes, with the intelligence in the infrastructure, not the vehicle.

Continuous operation
 

Dedicated closed lane

A defined route on your own premises. No mixed traffic, no open-road regulation — deployable in months, able to run 24/7.

System integration
 

Automated terminals

Autonomous loading and unloading at each building, connected to your WMS/ERP. No staging, no manual handling.

One material flow
 

Fleet control software

Centralised scheduling from one dashboard — connecting every building on your site into one continuous flow.

What the numbers show

One site. Real data. The case for switching.

From actual operational data at a confirmed customer site. All assumptions stated. Use the calculator to model your own configuration.

* Results are site-specific and depend on pallet volume, site layout, and current transport model.

€100-€200k

Annual savings per site

Mid-volume site, 300 pallets/day, two buildings. Includes labor, maintenance, insurance, downtime.

2 years

Payback period

Full CAPEX recovered within 17 months at the reference site configuration.

66-80%

OPEX reduction

Versus the forklift baseline. Full calculation available in the ROI Calculator.

Industries

Scalable across diverse industries

You can start small, scale big.

Sustainable and future-ready from food & beverage, to manufacturing, to logistics. ecoro’s cross-building automation adapts to your sites and grows with your operations at the fraction of a cost.

Manufacturing

Logistics & distribution

Food & FMCG

Airports

Trusted by forward-thinking logistics and manufacturing experts

Estimate your savings in 60 seconds.

Answer three quick questions. Get a savings range instantly.

Pallets moved per day (between buildings)
1,000 / day
505,000+
Distance between buildings (meters)
300 m
50 m2,000 m
Current transport method

Your Estimated Cost savings with ecoro freight automation: